Prefabricated steel Hisense logistic warehouse


General Information 


Size:40,000 Sq.m 

Construction time: cost 23 days to erect the 40,000 Sq.m warehouse 

Primary Steel Members: H columns and Beams with two coats

Secondary Steel Members: Z purlins with galvanized surface treatment

Bracing system: Tier brace, bracing bars, angle sheet, which can improve the stability and durability of complete structural buildings . 

Roof cladding: corrugated steel sheet + Fiber glass wool insulation 

Wall cladding: corrugated steel sheet + Fiber glass wool insulation 

Door: Roller Shutter Door


The 40,000-square-meter warehousing workshop of the first phase of Hisense Logistics Industrial Park project has been completed and delivered. The second phase of the project is progressing smoothly. The land acquisition has been completed and the enclosure is being built。


The Hisense Logistics Industrial Park project is one of the three characteristic industrial parks planned and constructed in our town with an output value of more than 20 billion RMB yuan. It is mainly engaged in the logistics and transportation of products in the Hisense (Shandong) Home Appliance Industrial Park. The total investment is 2 billion RMB yuan, covering an area of 400 mu, with a planned construction area of 160,000 square meters. The project is divided into three phases: the first phase uses 100 mu of land with a construction area of about 40,000 square meters, the second phase uses 200 acres of land with a construction area of about 80,000 square meters, and the third phase uses 100 mu of land with a construction area of about 40,000 square meters. After the overall project is completed, it can provide more than 800 jobs to the society, with significant economic and social benefits


Superior Prefabricated Steel Building for Your Demand 

YOUR BENEFITS AT A GLANCE

● Free span up to 60 m and various sidewall heights

● Flat or roof pitch of 10° or 22° or multi-roof. 

● Aesthetic integration of office rooms to maximize space

● Easy integration of mezzanines, crane bridges, solar panels

● Climate control thanks to different types of insulation sandwich panel

● Short time erection and seismic resistance 

● Various solutions to allow natural light inside your building

● Easy relocation, extension and adaptation

The construction of steel structure workshop (also called steel hall) is mainly divided into the following parts:

Embedded parts to stabilize the structure of the complete plant

Columns as primary steel members are generally H section welded steel coating with epoxy or alkyds paint for corrosion resistance 

For beams as primary steel members, generally H section welded steel are used. The height of the middle ridge is determined according to the span of the beam. 

Purlin as secondary steel members: C-shaped galvanized steel and Z-shaped galvanized steel are generally used.

Supports and braces are usually round steel coating anti-corrosion paint.

Roof and wall cladding system. The first one is a single separate tile (PPGI tile) without insulation layer. The second type is sandwich composite panel.  Polyurethane, glass wool, rock wool and EPS are sandwiched between the two layers of color-coated metal sheet to play the role of warming in winter and cooling in summer, and also has the effect of sound insulation and fire prevention. 

The main advantages of steel structure workshop are:

Light weight, high strength and large span:                 

Although the density of steel is higher than other building materials, its strength is very high. Under the same force, the steel structure has a small dead weight and can be made into a structure with a larger span.

Short construction time:                  

the structural parts of the plant are mainly produced in the factory and prefabricated, and then installed on the site. The erected work is convenient and the construction is convenient.

High fire resistance: 

When the surface temperature of the steel is within 150℃, its strength changes little. When the temperature exceeds 150℃, its strength decreases significantly. Generally, fire retardant coatings are applied to the surface of steel structures to form a protective film to increase the fire resistance limit of the components. Of course, the reasonable division of fire compartments and the use of fire shutters are also very important.

Sound insulation and heat preservation:                  

Fill the metal roof with sound insulation material (usually glass wool, EPS, rock wool, polyurethane), or add heat insulation reflective paint on the metal tile surface.