Current position:

Coffee Shop and Bakery Workshop in Jamaica


General Information 

Café shop Size : 15 x 12 x 8.2m

Bread bakery workshop size: 42 x 12 x 6.75m 

Construction site: Jamaica 

Primary steel members: H section welded column and beam with two coats 

Bracing: C section profile galvanized purlin 

Wall and Partition: EPS sandwich panel 

Exterior Roof: Steel sheet+ Insulation + steel mesh 

Interior ceiling : Sandwich panel 

Shop ceiling: PVC panel

Front Wall: Glass curtain wall 


Superior Prefabricated Steel Building for Your Demand 

YOUR BENEFITS AT A GLANCE

● Free span up to 60 m and various sidewall heights

● Flat or roof pitch of 10° or 22° or multi-roof. 

● Aesthetic integration of office rooms to maximize space

● Easy integration of mezzanines, crane bridges, solar panels

● Climate control thanks to different types of insulation sandwich panel

● Short time erection and seismic resistance 

● Various solutions to allow natural light inside your building

● Easy relocation, extension and adaptation

The construction of steel structure workshop (also called steel hall) is mainly divided into the following parts:

Embedded parts to stabilize the structure of the complete plant

Columns as primary steel members are generally H section welded steel coating with epoxy or alkyds paint for corrosion resistance 

For beams as primary steel members, generally H section welded steel are used. The height of the middle ridge is determined according to the span of the beam. 

Purlin as secondary steel members: C-shaped galvanized steel and Z-shaped galvanized steel are generally used.

Supports and braces are usually round steel coating anti-corrosion paint.

Roof and wall cladding system. The first one is a single separate tile (PPGI tile) without insulation layer. The second type is sandwich composite panel.  Polyurethane, glass wool, rock wool and EPS are sandwiched between the two layers of color-coated metal sheet to play the role of warming in winter and cooling in summer, and also has the effect of sound insulation and fire prevention. 

The main advantages of steel structure workshop are:

Light weight, high strength and large span:                 

Although the density of steel is higher than other building materials, its strength is very high. Under the same force, the steel structure has a small dead weight and can be made into a structure with a larger span.

Short construction time:                  

the structural parts of the plant are mainly produced in the factory and prefabricated, and then installed on the site. The erected work is convenient and the construction is convenient.

High fire resistance: 

When the surface temperature of the steel is within 150℃, its strength changes little. When the temperature exceeds 150℃, its strength decreases significantly. Generally, fire retardant coatings are applied to the surface of steel structures to form a protective film to increase the fire resistance limit of the components. Of course, the reasonable division of fire compartments and the use of fire shutters are also very important.

Sound insulation and heat preservation:                  

Fill the metal roof with sound insulation material (usually glass wool, EPS, rock wool, polyurethane), or add heat insulation reflective paint on the metal tile surface.

Related suggestion

Online consultation

Submit