Prefabricated steel structure workshop in Romania


General Information 


Romanian project includes a workshop with 2-storey office

Size: 8000 Sq.m 

Erection time: 2011 year 

Steel frame: H section steel column/ beam 

Wall/ roof cladding system: sandwich panel 


The steel structure workshop is mainly composed of steel, including the main bearing components composed of steel columns, steel beams, steel structure foundations, steel roof trusses and steel roofs

1. After the steel structure workshop is installed, the structure must not be changed, any bolts and other components must not be removed, and partition walls must not be added or reduced. If you need to replace parts, you must negotiate with the manufacturer, and the manufacturer will determine whether it can be replaced. After the steel structure has been used for about 3 years, it is necessary to carry out a paint repair to make the building beautiful and safe. The steel structure workshop is formed by connecting steel structure parts, so electrical equipment such as wires should be isolated by wire ducts and conduits to prevent electric shock

2. The cleaning and maintenance of the steel structure workshop must be carried out on a regular basis. Under normal circumstances, it takes one year of inspection and maintenance. When cleaning the outer wall of the steel structure workshop, be careful not to move it. Do not use abrasive cleaning products such as steel wire balls and brushes. When using clean water, rinse from top to bottom. Steel structures with branches, leaves and similar objects should be cleaned up in time to avoid unnecessary trouble in the backlog. If the surface of the metal plate in the steel structure workshop is damaged, it should be repaired in time to prevent the surface of the metal plate from being corroded by sunlight and rain. If necessary, all these highly elastic nano-materials can be used to protect metal roof panels and exert effective heat insulation and waterproof functions to save energy for indoor air conditioning.


Superior Prefabricated Steel Building for Your Demand 

YOUR BENEFITS AT A GLANCE

● Free span up to 60 m and various sidewall heights

● Flat or roof pitch of 10° or 22° or multi-roof. 

● Aesthetic integration of office rooms to maximize space

● Easy integration of mezzanines, crane bridges, solar panels

● Climate control thanks to different types of insulation sandwich panel

● Short time erection and seismic resistance 

● Various solutions to allow natural light inside your building

● Easy relocation, extension and adaptation

The construction of steel structure workshop (also called steel hall) is mainly divided into the following parts:

Embedded parts to stabilize the structure of the complete plant

Columns as primary steel members are generally H section welded steel coating with epoxy or alkyds paint for corrosion resistance 

For beams as primary steel members, generally H section welded steel are used. The height of the middle ridge is determined according to the span of the beam. 

Purlin as secondary steel members: C-shaped galvanized steel and Z-shaped galvanized steel are generally used.

Supports and braces are usually round steel coating anti-corrosion paint.

Roof and wall cladding system. The first one is a single separate tile (PPGI tile) without insulation layer. The second type is sandwich composite panel.  Polyurethane, glass wool, rock wool and EPS are sandwiched between the two layers of color-coated metal sheet to play the role of warming in winter and cooling in summer, and also has the effect of sound insulation and fire prevention. 

The main advantages of steel structure workshop are:

Light weight, high strength and large span:                 

Although the density of steel is higher than other building materials, its strength is very high. Under the same force, the steel structure has a small dead weight and can be made into a structure with a larger span.

Short construction time:                  

the structural parts of the plant are mainly produced in the factory and prefabricated, and then installed on the site. The erected work is convenient and the construction is convenient.

High fire resistance: 

When the surface temperature of the steel is within 150℃, its strength changes little. When the temperature exceeds 150℃, its strength decreases significantly. Generally, fire retardant coatings are applied to the surface of steel structures to form a protective film to increase the fire resistance limit of the components. Of course, the reasonable division of fire compartments and the use of fire shutters are also very important.

Sound insulation and heat preservation:                  

Fill the metal roof with sound insulation material (usually glass wool, EPS, rock wool, polyurethane), or add heat insulation reflective paint on the metal tile surface.