News

Current position:
Installation method for making movable house more firm

1. The panel of the house shall be installed stably, the eaves shall be straight, and the overlapping direction of the panel shall be correct and consistent


2. The circuit of the movable board room shall be covered with PVC pipe (slot), the wiring shall be neat and beautiful, the electrical structure shall meet the design requirements, no insulation aging and long service life


3. The enclosure board (roof board and wall board) of the movable plank house shall not be obviously deformed and damaged; The fixing bolt, waterproof washer, metal washer and nylon sleeve must be complete and reliable, and the sealant must be complete and effective


4. Lightning protection: the lightning protection grounding device shall meet the design and specification requirements, and the grounding resistance shall meet the standards


5. Anti corrosion: steel members shall be painted without corrosion and properly protected with exposed bolts; The anti-corrosion measures in strong corrosive environment shall meet the design requirements; The surrounding of the mobile room shall be drained smoothly without ponding and sundries


6. The attached wall panel shall be arranged correctly to make the surface of the wall panel smooth; The embedded wallboard shall be installed stably, and shall be overlapped up and down, and the outer board shall be overlapped down, and the overlapping length shall not be less than 15 mm